| Serial No. |
Item |
|
Rate proposed for Greater NOIDA Industrial Development
Authority |
| 1. (a) |
Unauthorised construction done
before submitting the plans for sanction or unauthorised construction carried out after
submission of building plan but, prior to issue of Sanction if permitted under approved
building bye-laws. |
|
At the rate 5 percent of the cost of construction
taking cost as Rs. 2,000.00 per sq. mtr. |
| (b) |
Unauthorised construction done
after expiry of the sanction period and without setting the sanction revalidated or
unauthorised construction done by persons other than the one in whose name sanction was
previously obtained without obtaining fresh sanction in favour of successors or deviations
against the sanctioned building plans, if permissible under approved Building Bye-Laws. |
|
1 percent of the cost of construction taking
construction as Rs 2,000.00 sq. mtr. |
| (c) |
Deviation against the
sanctioned building plans within sanctioned covered area and without infringing any
BBL/setback. |
|
No penalty. |
| 2. |
Excess coverage beyond
permissible on each floor (i) 5 percent of the permissible coverage.
Beyond 5 percent and up to 10 percent.
Beyond 10 percent and upto 15 percent. |
|
Rs. 2,000.00 (Rs. 5,000.00 in case of commercial) per
sq. mtr.
Rs. 5,000.00 (Rs. 8,000.00 in case of commercial.)Not permissible. |
| 3. |
(a) Excess area of loft |
|
|
(i)Residential :
Upto 5 percent of the loft area allowed in approved Building bye-laws. |
@ |
10 percent cost of the cost of the
construction taking Construction cost as Rs. 150.00 per sq. mtr. |
| (ii) Beyond 5 percent and upto
10 percent of the loft area allowed in approved Building Bye-laws. |
@ |
20 percent cost of the cost of the
construction taking construction cost as Rs. 150.00 sq. mtr. |
| 3. |
(b) Other Buildings : |
|
Ditto. |
| (i) Upto 5 percent of the loft
area allowed in Tentative Building Bye-laws of greater Noida Industrial Development
Authority. |
|
|
| (ii) Beyond 5 percent and up to
10 percent of the loft area allowed in Tentative Building Bye-laws of the greater NOIDA
Industrial Development Authority. |
@ |
40 percent cost of the cost of the
construction taking construction cost as Rs. 150.00 sq. mtr. |
| 4. |
Setback infringement on each
floor : |
|
|
| (i) Up to 0.15 mtr. |
|
Rs. 2,000.00 (Rs. 5000.00 in case of
commercial) per sq. mtr. + excessive coverage if not charged otherwise. |
| (ii) Beyond 0.15 M and up to
0.30M |
|
Rs. 3000.00 (Rs. 8000.00 in case of
commercial) + excessive coverage if not charged otherwise. |
| (iii) Beyond 0.30 M |
|
Not permitted. |
| 5. |
Reduction of the height of W.C.
bath, latrine, kitchen : |
|
|
| (i) Up to 0.07 M |
|
No penalty |
| (ii) Beyond 0.075 M and up to
0.30 M |
|
Rs. 25.00 per cms. |
| (iii) Beyond 0.30 M |
|
Not permitted. |
| 6. |
Reduction in width of W.C.
bath, latrines, kitchen and room provided the defect in area is not more than 20 percent
of minimum permissible are : |
|
|
| Up to 0.075 M |
|
No penalty |
| Beyond 0.075 M and up to 1.15 M |
|
Rs. 1000.00 per sq. mtr.of excess area |
| 7. |
Increase in the size of the
canopy |
@ |
25 percent of the cost of the construction
of entire canopy taking construction cost as Rs. 150.00 per sq. mtr. |
| 8. |
Few uncovered steps of the main
staircase in the setback portion |
|
Rs. 100.00 per step. |
| 9. |
Reduction in the headway
staircase from the minimum permissible limits : |
|
|
| (i) Up to 0.075 M |
|
No penalty |
| (ii) Beyond 0.075 M and upto
0.015 M |
|
Rs. 50 per cm. |
| (iii) Beyond 0.015 M |
|
Not permitted. |
| 10. |
Steps of staircase defective in
tread and riser or in case of more than 12 riser in each flight. |
|
Rs. 50.00 each |
| 11. |
Pargola if provided only for
Architectural reasons and in case of residential building only. |
@ |
25 percent of the cost of construction of
the entire Pargola taking construction cost of Rs. 200.00 per sq. mtr. |
| 12. |
Staircase with riser but
without enclosed area below it and without mumty at top in rear setback |
|
As per covered area rate. |
| 13. |
End wall above 0.45 M and upto
0.90 M width in terrace type construction. |
|
Rs 100.00 each |
| 14. |
Enclosing of the front balcony
or stair case by Jali-wall. |
@ |
as per covered rates @ infringement of
setback @ Rs. 500.00 per sq. mtr. of the affected area of setback. |
| 15. |
RCC projection beyond 0.75 M
and upto 0.90 M and where on ones own land even if accessible. |
@ |
10 percent of the cost of construction
taking construction cost as Rs. 250.00 per sq. mtr. |
| 16. |
Extra slab in mumty provided
headway is maintained as per approved building byelaws only upto 0.90 M |
@ |
25 percent of the cost of construction
taking construction as Rs. 150.00 per sq. mtr. |
| 17. |
Excess height of the building
from point of view of rear airplane |
|
Rs. 1000.00 per sq. mtr. of the affected
area. |
| 18. |
Defective height of passage |
|
|
|
(i) Upto 0.075 M |
|
No penalty |
|
(ii) Beyond 0.075 M and up to 0.15 M |
|
Rs. 25.00 per cm. |
|
(iii) Beyond 0.15 M |
|
Not permitted |
| 19. |
Defective height of the
mezzanine |
|
|
|
(i) Upto 0.15 M |
|
Rs. 25.00 per cm. |
|
(ii) Beyond 0.15 M upto 0.30 M |
|
Rs. 50.00 per cm. |
| 20. |
Defective height of the Loft in
residential building beyond 1.5 M permissible: |
|
|
|
(i) Up to 0.15 M |
|
Rs 25.00 per cm. |
|
(ii) Beyond 0.015 M and upto 0.30 M |
|
Rs. 50.00 per cm. |
|
(iii) Beyond 0.30 M |
|
Not permitted |
| 21. |
Defective Height of the loft in
commercial building beyond 1.626 M (shop) : |
|
|
|
(i) Up to 0.075 M |
@ |
Rs. 100.00 per sq. cm. |
|
(ii) Beyond 0.075 M and upto 0.15 M |
@ |
Rs. 200.00 per sq. cm. |
|
(iii) Beyond 0.15 M and upto 0.30 M |
@ |
Rs. 500.00 per sq. cm. |
| 22. |
Defective height of basement : |
|
|
|
(i) Up to 0.015 M |
@ |
Rs. 100.00 per sq. cm. |
|
(ii) Beyond 0.015 M and upto 0.30 M |
@ |
Rs. 200.00 per sq. cm. |
|
(iii) Beyond 0.30 M and upto 0.45 M |
@ |
Rs. 500.00 per sq. cm. |
| 23. |
Partitioning of Barsati
provided the area of Barsati floor does not exceed permissible coverage area./Rs. 500.00
lumpsum |
|
|
| 24. |
(i) Balcony width up to 0.75 M |
|
No penalty |
| (i) Balcony width up to 0.90 M |
|
Rs. 100.00 per sq. mtr. |
| (i) Balcony width above 0.90 M |
|
Not permitted. |
| 25. |
Partition walls in mezzanine
floor and basement floor provided no byelaws are in fringed : |
|
|
|
(i) Masonry |
|
5 percent of the cost of construction
taking construction cost as Rs. 200.00 cubic mtr. |
|
(ii) Wooden up to 2 M height |
|
No penalty |
|
(iii) Beyond 2 M height |
|
Rs. 200.00 per cubic mtr. |
| 26. |
End wall up to 0.45 M as
architectural feature |
|
No penalty |
| 27. |
RCC Cup Board up to 0.60 M
width in setback from ground level. |
|
Rs. 2,000.00 per sq. mtr. |
| 28. |
(i) Bay window up to 0.60 M
width in setback |
|
Rs. 2,000.00 per sq. mtr. |
| (ii) Beyond 0.60 M (Bay window) |
|
Not permitted |
| 29. |
Boiler with flue
bhatties, Electric furnace and the like if uncovered in the rear setback of built-up shed
constructed by the Authority and rear and side setback in case of industrial plot |
|
(a) Rs. 1,500.00 per sq. mtr. up to 10 sq.
mtr. |
|
(b) Rs. 3,000.00 per sq. mtr. next 10 sq.
mtr. |
|
(c) Above 20 sq. mtr. not allowed |
| 30. |
Cooling tower in the rear
setback of built-up shed constructed by authority and rear and side setback in case of
industrial plot |
|
Rs. 500.00 per sq. mtr. |
| 31. |
Electric
transformer in the rear setback of built-up shed constructed by Authority, if there is no
setback then in the front back and rear or side-back in case of industrial plot. |
|
(a) Rs. 200.00 up to 100 KVA. |
|
(b) Rs. 300.00 above 100 KVA. |
| 32. |
Industrial vessels without any
cover thereupon in the rear or front setback of built-up shed constructed by the Authority
and front rear or side set-back in case of industrial plot. |
|
No penalty |
| 33. |
Tank and Hodies in the rear or
front setback of built-up shed constructed by the Authority and front rear or side setback
in case of industrial plot. |
|
No penalty |
| 34. |
Cycle/scooter stand even if
covered/temporary cover in the rear or front setback of built-up shed constructed by
authority and front rear or side setback in case of industrial plot. |
|
No penalty |