APPENDIX-9
Form for Completion Certificate for Building Work To The Chief Executive Officer, Greater Noida Industrial Development Authority, Uttar Pradesh.
Sir, I hereby certify that the erection/re-erection/material alteration/demolition in/on building on Plot No ���������in Estate------------------- Sector------------------------------ in Greater Noida has been supervised by me and the completion plan along with the required documents are attached herewith . The plans were sanctioned vide letter no����.. dated�����and the work has been completed to my best satisfaction. The workmanship and all the materials which have been used are strictly in accordance with the general, detailed specifications. No provision of the regulations, directions, no requisition made, conditions, prescribed or order issued there under have been transferred in the course of work. The land fit for construction for which it has been developed or re-developed.\
Name of the Licensed Technical Person___________________________________________ Address of Licensed Technical Person.____________________________________________
Dated: NOTE�Strike out the words which are not applicable.
CHECKLIST -9A (For buildings on individual residential plots) i) 3 copies of drawings (one set cloth mounted) duly signed by Licensed Technical Person. and owner. ii) Completion fees iii) Valid time extension certificate, if applicable. iv) Photographs of the building from front and side setbacks. v) Photocopy of registration of licensed technical person signing the plan and Appendixes. vi) Copy of receipt of payment of Water/Sewer connection charges, Meter charges and any other charges as may be required by the Authority. vii) Floppies/CD�s of the building plan submitted.
CHECKLIST �9B (For buildings on Plots other than individual residential plots) i) 3 copies of drawings (one set cloth mounted) duly signed by Licensed Technical Person .and owner. ii) Completion fees iii) Valid time extension certificate, if applicable. iv) Photographs of the building from front and side setbacks. v) Photocopy of registration of licensed technical person signing the plan and Appendixes. vi) NOC from Chief Fire Officer, wherever applicable. vii) NOC from Explosive Department, wherever applicable. viii) Certificate from owner and Structural Engineer regarding earthquake resistance of building as per Appendix 8/A/B//D, if applicable. ix) Copy of receipt of fees deposited with Noida Power Company Ltd. x) Copy of receipt of payment of water/sewer connection charges, Meter charges if not submitted at the time of plan approval, and any other charges as may be required by the Authority. xi) Flopies /CD�s of the building plan submitted. CHECKLIST �9C (For buildings layout and sub-division of land) i) 3 copies of drawings (one set cloth mounted) duly signed by Licensed Technical Person .and owner. ii) Completion fees iii) Valid time extension certificate, if applicable. iv) Photographs of the site from all sides . v) Photocopy of registration of licensed technical person signing the plan and Appendixes. vi) NOC from Chief Fire Officer, wherever applicable. vii) NOC from Explosive Department, wherever applicable. viii) Certificate from owner and Structural Engineer regarding earthquake resistance of building as per Appendix 8/A/B//D, if applicable. ix) Copy of receipt of fees deposited with Noida Power Company Ltd. x) Copy of receipt of payment of water/sewer connection charges, Meter charges if not submitted at the time of plan approval, and any other charges as may be required by the Authority. xi) Flopies /CD�s of the building plan submitted |
|