|
RESIDENTIAL PROPERTIES FOR LEASE DEED REGISTRATION BY FIRST ALLOTTEE
(A) For plot allotment @ Rs. 950.00 per sqm.
| S. No. |
Plot Size
(in Sqm.) |
Lease Rent |
Stamp Paper
(At present) |
Ramp Charges |
1% Penalty for
late registration |
Registration Fee |
| 1. |
60 |
5820.00 |
5050.00 |
13200.00 |
570.00 |
3000.00 |
| 2. |
120 |
11520.00 |
10100.00 |
14550.00 |
1140.00 |
5000.00 |
| 3. |
200 |
19120.00 |
16800.00 |
15550.00 |
1900.00 |
5000.00 |
| 4. |
350 |
33370.00 |
29300.00 |
17550.00 |
3325.00 |
5000.00 |
| 5. |
450 |
42870.00 |
37700.00 |
18050.00 |
4275.00 |
5000.00 |
(B) For plot allotment @ Rs. 1200.00 per sqm.
| S. No. |
Plot Size
(in Sqm.) |
Lease Rent |
Stamp Paper
(At present) |
Ramp Charges |
1% Penalty for
late registration |
Registration Fee |
| 1. |
60 |
7320.00 |
6400.00 |
13200.00 |
720.00 |
4000.00 |
| 2. |
120 |
14520.00 |
12750.00 |
14550.00 |
1440.00 |
5000.00 |
| 3. |
200 |
24120.00 |
21150.00 |
15550.00 |
2400.00 |
5000.00 |
(C) For plot allotment @ Rs. 2400.00 per sqm.
| S. No. |
Plot Size
(in Sqm.) |
Lease Rent |
Stamp Paper |
Ramp Charges |
1% Penalty for
late registration |
Registration Fee |
| 1. |
60 |
14520/- |
12720/- |
13200/- |
1440/- |
4000/- |
| 2. |
120 |
28920/- |
25400/- |
14550/- |
2880/- |
4500/- |
| 3. |
150 |
36120/- |
31700/- |
15550/- |
3600/- |
5000/- |
| 4. |
250 |
60120/- |
52900/- |
16200/- |
6000/- |
5060/- |
| 5. |
275 |
66120/- |
58100/- |
16200/- |
6600/- |
5000/- |
| 6. |
288 |
69240/- |
60900/- |
16200/- |
6912/- |
5060/- |
| 7. |
350 |
84120/- |
74000/- |
17550/- |
8400/- |
5000/- |
| 8. |
450 |
108120/- |
95200/- |
18050/- |
10800/- |
5000/- |
| 9. |
500 |
120120/- |
105700/- |
18700/- |
12000/- |
5060/- |
Note: - The rates are based on Standard plot sizes. In case the plot size increases (in lease plan) the amount shall be calculated as below.
- Access area amount: @ rate of allotment
- Lease Rent: 10% of the total plot value
- Others expenses shall remain same
- In every case of registration, locational charges, if applicable as per brochures of specific scheme, shall be included in the premium of the plot for calculating lease rent, stamp duty
- Normally, our set rules for every scheme except Delta, P3 & Sector-37 is that:
- Within 3 years from the date of allotment, allottee has to get his/her plot registered
- Within 5 years from the date of allotment, allottee has to get construction complete and obtain completion certificate by even constructing the minimum, as per our building by laws
- After elapse of 5 years from the date of allotment, allottee can avail another 3 years as time extension for construction with 4% time extension charge for the first year, 6% for the second year and 8% for the third year (Cumulative)
- Last date of registration of plot with 1% penalty of the total premium of the plot is 31-12-2002 in sector Delta, Sec.-37, Pocket-P3
- In sector-Delta, P-3, Sector-37, the last date for construction is December 2003 beyond which allottee can avail 3 years as time extension for construction with time extension charges @ 4% for the first year, 6% for the second years and 8% for the third year (Cumulative)
- Last date of registration of plot with 1% penalty of the total premium of the plot is 31-12-2002 in sector SWARN NAGARI and untill 31-3-2003 along with 2% additional penalty
- Last date for construction in Swarn Nagari sector is 19-11-2003 beyond which allottee can avail 3 years as time extension for construction with time extension charges @ 4% for the first year, 6% for the second years and 8% for the third year (Cumulative).
FOR TRANSFER OF UNREGISTERED PLOT OR REGISTERED PLOT TO SECOND ALLOTEE:
This is to inform that if the first allottee transfers the plot (unregistered or registered) the second allottee is required to execute transfer deed (registration of plot before the sub-registrar) for which stamp duty will be calculated as 8 % of the circle rate of the plot size. The current circle rate is Rs. 3680/- per sqm. for residential plots.
Top
|