GREATER NOIDA |
GURGAON |
| 1. |
RATES |
The land rates are lower. |
Land rates are very high as high
at Rs. 2200
per square meter. Rather land is not available in Gurgaon at all.
|
| 2.
i.
ii.
iii. |
ACCESSIBILITY
|
Better accessibility to Delhi and
the area will have three different access
On G.T. Road
On National Highway 24
Expressway (Kalindi Kunj to Greater Noida expressway is under
construction) that will reduce the distance by 20 minutes.
Faridabad-Noida-Ghaziabad Expressway which will open up the area on
Bombay route
Road structure is better
|
Only one highway called Jaipur Highway 200'-0" is providing access
to the area.
|
| ROADS |
Minimum road width is 80'-0" |
Minimum road width is 45'-0"
|
|
TIME TAKEN FROM DELHI |
45 minutes from India Gate. |
60 minutes from India Gate.
|
| 3. |
POWER |
Privatised Power distribution and
23 hours power availability.
Own power generation plant will be setup within 2 years.
|
Condition of power supply
dependent upon Haryana State Electricity Board. |
| 4. |
WATER SUPPLY |
Water is sweet, portable and water
table is high. At the moment the company can have a boring on fixed prices
and have 24 hrs. supply, a 24 hrs. water supply is planned.
|
Ground water is not available. At
present intermittent flow of supply from 65 km long drain which is called
the western Yamuna Canal. |
| 5. |
SOIL |
Good soil condition. |
Soil is not fertile and has rocky
structure.
|
| 6. |
POLLUTION FREE |
33 polluting uses prohibited.
Eco-friendly environment.
|
|
| 7. |
CONTAINER CONNECTIVITY |
2nd terminal of Container Station
to come up, an extension of Tughlakabad Depot.
|
No such facility is there. |
| 8. |
INCENTIVES TO INDUSTRY-
- Production Incentives |
Production incentive of an amount
equivalent to Rs. 50/- per sq. mt. granted if production started within 18
months of possession.
|
No such facility is available
there. |
| 9. |
SALES TAX |
Trade Tax exemption of U.P.
Government is admissible.
|
--- |
| 10. |
SUPERIOR ADMINISTRATIVE INTERFACE |
i)
Single Window System
provides fast and
efficient clearances.
ii) Electricity
iii) Water
iv) Power
|
---
|