Building Bye-Laws

 

INDUSTRIAL BUILDINGS
(a) General setbacks in case of industrial building shall be as given in the table below
 
Serial No. Plot size in sq. mtrs. Front in mtrs. Rear in mtrs. Side in Mtrs. Side in mtrs.
1 Up to 100 3.0 - - -
2 From 101 to 450 4.5 1.5 3.0 1.5
3 From 451 t0 2,000 6.0 4.0 3.0 4.5
4 From 2,001 to 5,000 9.0 9.0 4.5 4.5
5 From 5,001 to 12,000 9.0 9.0 4.5 6.0
6 From 12,001 to 20,000 12.0 12.0 9.0 9.0
7 Above 20,000 15.0 15.0 15.0 15.0

 

Note - Setbacks mentioned above are subject to confirmation from the set backs plan prepared by the Authority.
(b) FAR - In case of industrial building maximum FAR shall be as given in the table below 
 
Serial no. Plot size in sq.mtrs. Maximum Ground Coverage (%) Maximum FAR
1 Up to 100 60 120
2 from 101 to 450 60 100
3 From 451 to 2,000 55 80
4 From 2,001 to 12,000 55 70
5 From 12,001 to 20,000 50 65
6 Above 20,000 50 60
Note: Detailed Building Bye Laws and urban design regulations can be obtained from the office of G.M. (Industries).

 

 

Plot Holders / Allotees can obtain details of their up-to-date account status from our specially constructed web site.   
Please click here to browse to the web site

  

Industries ] Ecotech ] Barred Units ] Comparison ] [ Building Bye-Laws ] Existing Industries ] Incentives ] Procedures ] Allotment Terms ] Form ]

 
Disclaimer: Although all attempts are being made to keep the information provided on this web site current, some information is subject to change at short notice. Users are requested to confirm the current status of the prescribed information with the Authority before proceeding to utilize the information.
  

Copyright Greater Noida Industrial Development Authority.
Site Designed and Maintained By Univall

Tuesday, February 11, 2003 01:01:55 AM