Building Byelaws - Chapter II |
|
|
|
|
CHAPTER II�Layout/Building Permit and Occupancy
4. Building
permit�No person shall erect any building or a boundary wall or fencing
without obtaining a prior building permit thereof, from the Chief Executive
Officer or an Officer authorised by the Chief Executive Officer for this
purpose.
5.
Application for building permit�
(1) Every person
who intends to erect a building within the Area shall give application in the
form given at Appendix-l.
(2) The
application for building permit shall be accompanied by documents as mentioned
in the checklist annexed to Appendix-1.
(3) Such
application shall not be considered until the applicant has paid the fees
mentioned in Regulation no.7.
(4) In case of
objections, the fees so paid shall not be refunded to the applicant but the
applicant shall be allowed to resubmit the plan without any additional fees
after complying with all the objec�tions within a period of one year from the
date of receipt of the objection order.
(5) No application
for building permit shall be necessary for the following additions/alterations
provided they do not violate any of the provisions regarding general building
requirements, structural stability and fire safety requirements specified in
National Building Code:-
(a) Whitewashing
and painting.
(b) Plastering and
patch work.
(c) Renewal of
roof at the same height.
(d) Reconstruction
of portions of building damaged by any natural calamity to the same extent as
previously approved.
(e) Internal
additions/alterations within the building envelop certified and supervised by
a Licensed Technical Person Architect registered
(f) Digging or
filling of earth.
An intimation to
this affect shall be submitted to the Authority in writing before commencement
of construction.
6. 1
INFORMATION ACCOMPANYING APPLICATION FOR LAYOUT/BUILDING PERMIT
(A) Layouts
regarding sub- division of land
i) The site plan shall show�
ii) The boundaries of the plot and the name / no. of the
properties and roads abutting to the plot.
iii) Plot number of the property on which the building is
intended to be erected
iv) All existing buildings and physical features standing on,
over or under the site;
v) Building envelope at each floor level in relation to the
site
vi) The total plot area and the break-up of area under
different uses, roads and open space with their percentages in terms of the
total area of the plot.
vii) Total FAR, Gr. Cov and height of the building on each category proposed.
viii) Setbacks of total plot as well as individual proposed plots.
ix) Details of setback, FAR, Gr Cov. on each irregular shaped
plots in the proposed layout on at least 1: 500 scale.
x) Sewerage and drainage lines upto discharge point and water
supply lines.
xi) Details of boundary wall, plinth, culvert and ramp, trees.
xii) Scale used and the direction of north point relating to plan of proposed
building;
xiii) Parking plans indicating the parking spaces for all the buildings.
xiv) Landscape Plan.
xv) Location and size of temporary structures like stores, labour hutments, site
office and such like.
xvi) Electrical load requirement.
xvii) (II) Building Plan: For any proposed structure requirement of building plan
shall be as per clause 6.1 (B) 6.1 (C) and 6.1 (D) as the case may be.
xviii) (III) Service Plans- Details of private water supply and sewage disposal
sys�tem independent of the Municipal Services, if any and rain water
harvesting system as per U.P Govt. orders.
xix) (IV) Specification- General specification of materials to be used in different
parts of the building as given in Appendix-6.
xx) (V) Documents as per Checklist 1C annexed to Appendix 1
(B) Residential buildings on plots other than group housing (flatted) :
(I) The plan
shall show�
i) Key Plan � A key plan drawn to a scale of not less than 1 : 10,000 shall be
submitted along with the application for a development/building permit showing
the boundary locations of the site with respect to neighborhood landmarks.
ii) The boundaries of the plot and the name / number of the
properties and roads abutting the plot.
iii) Plot number of the property on which the building is
intended to be erected.
iv) All existing buildings and physical features standing on,
over or under the site.
v) Building envelope at each floor level in relation to the
site.
vi) The total plot area and the break-up of covered areas on
each floor with their percentages in terms of the total area of the plot.
vii) Total height of the building.
viii) Setbacks.
ix) Details of projections and structures in setbacks.
x) Sewerage and drainage lines at discharge point and water
supply lines.
xi) Details of boundary wall and its plinth, culvert and ramp,
trees, concealing of water tank on roof with jaali.
xii) Car parking, if applicable.
xiii) Scale used and the direction of north point relating to plan of proposed
building;
(II) Documents as per Checklist 1-A enclosed with Appendix-1
(C) All
other buildings
(I) The site
plan shall show�
i) The boundaries of the plot and the name / no. of the properties and roads
abutting to the plot.
ii) Plot number of the property on which the building is
intended to be erected
iii) All existing buildings and physical features standing on,
over or under the site;
iv) Building envelope at each floor level in relation to the
site
v) The total plot area and the break-up of covered areas on
each floor with their percentages in terms of the total area of the plot.
vi) Total height of the building.
vii) Setbacks.
viii) Details of projections and structures in setbacks.
ix) Sewerage and drainage lines upto discharge point and water
supply lines.
x) Details of boundary wall, plinth, culvert and ramp, trees.
xi) Scale used and the direction of north point relating to plan of proposed
building;
xii) Parking plans indicating the parking spaces for all the buildings.
xiii) Landscape Plan.
xiv) Location and size of temporary structures like stores, labour hutments, site
office.
xv) Electrical load requirement.
(II)
Building Plan�The plan of the building, elevations and sections
accompanying the applica�tion shall be drawn to a scale not less than 1:200�
i) The plan shall include the floor plans of building floors together with the
covered area.
ii) The plan shall specify the use of all parts of the
building;
iii) The plan shall show water supply, sewerage, drainage
lines and the like;
iv) The plan shall include sectional drawing showing clearly
the thickness of walls, size and spacing of framing members and floor slabs.
The sections shall also indicate the height of the rooms and the parapet. At
least one cross section shall be taken through the staircase;
v) The plan shall show all street elevations;
vi) The plan shall include terrace plan indicating the
drainage and the slope of the roof;
vii) The plan shall give dimension of the permissible projections in setbacks;
viii) The plan shall give indication of the north point in relation to the plan and
scale used.
(III) Building
plans for all types of multi- storeyed buildings-For multi-storeyed
buildings which are more than 15 meters in height, the following additional
information shall be indicated in the build�ing plans in addition to those
mentioned in clause (II) above�
i) Access for fire appliances and vehicles and details of vehicular turning
circle and clear motorable access way around the building;
ii) Size (width) of main and alternate staircase along with
balcony, corridors and ventilated lobby approach;
iii) Location and details of lift enclosures;
iv) Location and size of fire lift;
v) Smoke stop lobby doors, if provided;
vi) Refuse area, refuse chutes, refuse chamber, service ducts,
etc. if any.
vii) Air conditioning system, if provided, with position of dampers, mechanical
ventilation system, electrical services, boilers, gas pipes or the like;
viii) Details of exits including provision of ramps for hospitals and special lifts;
ix) Location of generator, transformer and switch gear room;
x) Smoke exhauster system, if any;
xi) Details of fire alarm system;
xii) Location of centralised control, connecting all fire alarm system, built in
fire protection arrangements and public address system;
xiii) Location and dimension of static water storage tank and pump rooms with fire
fighting inlets for mobile pump and water storage tank;
xiv) Location and details of first aid fire fighting equipment and installations.
xv) Location and details of fixed fire protection installations such as
sprinklers, wet risers, hose-reels, drenchers, CO2 installation,
etc;
(IV) Service
Plans- Details of private water supply and sewage disposal sys�tem independent
of the Municipal Services, if any and rain water harvesting system.
(V) Specification-
General specification of materials to be used in different parts of the
building as given in Appendix-6.
(VI) Documents as
per Checklist 1B annexed to Appendix 1
D Temporary Building
(I) The site
plan shall show�
i) The boundaries of the plot and the name / no. of the properties and roads
abutting to the plot.
ii) Plot number of the property on which the building is
intended to be erected
iii) All existing buildings and physical features standing on,
over or under the site;
iv) Total height of the building.
v) Setbacks.
vi) Details of projections and structures in setbacks.
vii) Sewerage and drainage lines upto discharge point and water supply lines.
viii) Scale used and the direction of north point relating to plan of proposed
building;
x) Location and size of temporary structures like stores, labour hutments, site office or such like temporary structures.
(II)
Building Plan�The plans shall be submitted for building other than
labour hutment The plan of the building, elevations and sections accompanying
the applica�tion shall be drawn to a scale not less than 1:200�
i) The plan shall include the floor plans of building floors together with the
covered area.
ii) The plan shall specify the use of all parts of the
building;
iii) The plan shall show water supply, sewerage, drainage
lines and the like;
iv) The plan shall include sectional drawing showing clearly
the thickness of walls, size and spacing of framing members and floor slabs.
The sections shall also indicate the height of the rooms and the parapet.
v) The plan shall show all street elevations;
vi) The plan shall give dimension of the permissible
projections in setbacks;
vii) The plan shall give indication of the north point in relation to the plan and
scale used.
(III)
Specification- General specification of materials to be used in different
parts of the building as given in Appendix-6.
(IV) Documents
as per Checklist 1D annexed to Appendix 1
6. (2) Site-plan shall be drawn to a scale as
follows:
1 TABLE
|
Site area |
Scale |
|
Up to 0.1
hectare |
Not less
than 1: 200 |
|
Up to 0.1
hectare-1 hectare |
Not less
than 1: 500 |
|
More than 1
hectare |
Not less
than 1: 1000 |
6. (3) Recommended notation for colouring of plans�The
site and building plans shall be coloured as specified in the table given
below where items of work are not identified, the colouring notation used
shall be indexed:
|
Serial No. |
Item |
Site Plan |
Building
Plan |
|
1. |
Plot lines |
Thick green |
Thick green |
|
2. |
Existing
street |
Green |
.. |
|
3. |
Permissible
building line |
Thick dotted
green |
.. |
|
4. |
Existing work
(Outline) |
Green |
Green |
|
5. |
Work proposed
to be demolished |
Yellow hatched |
Yellow hatched |
6. |
Proposed:
a)Additions/Alterations.
b)Entirely new
work |
Red
not to be
colored |
Red
Not to be
coloured |
|
7. |
Drainage |
Red dotted |
Red dotted |
|
8. |
Water Supply |
Green dotted
thin |
Green dotted
thin |
6. (4) Preparation and signing of Plans�All
plans shall be prepared and signed by Licensed Technical Person as per
Appendix-12.
7.
Building permit fee, completion fees, temporary
structures permit fees and calculation thereof�
(I)The applicant
shall deposit building permit fees as stipulated by the Authority from time to
time. At present, the scale of fees for building permit is as follows:
i) Residential buildings Rs. 2/- per sq. mtr. covered area on all floors.
ii) Commercial buildings Rs. 10/- per sq.. mtr. covered area
on all floors.
iii) For all other type of buildings Rs. 5/- sq. mtr. of
covered area on all floors.
iv) For layout plan � Rs. 1/- per sq. meter for plot area
upto 10.0 acres and 0.50 paise per sq.meter for area above 10.0 acres
(2) If the use of
the building is changed then the fee in case of additions and alterations of
building, shall be calculated with reference to the use proposed.
(3) In case of
re-erection of existing building after demolition, fees chargeable shall be
the same as erection of new buildings.
(4) The fee for
revised plan of a building which has already been sanctioned, shall be one
fourth of the fee chargeable on the sanctioned plan, subject to the condition
that the covered area of the building has not increased than in the original
sanctioned plan.
(5) The area
covered in the basement, as the case may be, shall be counted towards the
covered area for purpose of calculation of fees.
(6) The fee in
case of buildings with principal and subsidiary occupancies, in which the fees
levi�able are different than the fees for the total building schemes, shall be
as per the rates for individual occupancies.
(7) The
revalidation fee of a building permit shall be 10 per cent of the original
building permit fee paid with the application, if the application is made
within the period of validity of the building permit. In case the building is
under construction as per the sanctioned plans and the application is made
after the validity period from the date of sanction then the revalidation fee
shall be original building permit fee.
(8) In case of
construction without issue of building permit or fees applying for building
permit then a penalty of Rs 1000 per sq m covered area shall be levied, if
all provisions as per byelaws are complied with.
(9) In case of
construction without revalidation a fees of Rs 20 per sq m of covered area
shall be levied if all provisions as per byelaws are complied with
(10) In case of
revision in layout plan 50% of the fees of total payable layout plan fees
shall be levied. In case of repeated revisions after second revision, fees for
subsequent revisions shall be equivalent to total layout fees payable as
amended from time to time.
(11) Malba charges
of Rs. 11 per sq m shall be levied over total covered area for all building.
In case of plot size above 2000 sq m the same shall be exempted if an
affidavit on Rs 10 stamp paper duly notarized, is submitted by applicant that
all malba during construction shall be kept within the plot.
(12) The applicant
shall deposit completion fees as stipulated by the Authority from time to
time. At present, the scale of fees for completion is as follows:
i) Residential buildings Rs. 200 only.
ii) Commercial buildings Rs. 5/- per sq.. mtr. covered area
on all floors.
iii) For all other type of buildings Rs. 2.5/- sq. mtr. of
covered area on all floors.
iv) For layout plan � Rs. 0.5/- per sq. meter for plot area
upto 10.0 acres and 0.250 paise per sq.meter for area above 10.0 acres.
In case even after
two objection letters issued by Authority if rectification of all objections
is not done then Rs. 500 shall be levied towards site visit fees each
subsequent visit.
(13) The applicant shall deposit 25% of the building permit fees for temporary
structures other than labor hutments as per individual use of the structure.
For labor hutment fees shall be Rs. 0.25 per sq m of covered area.
(14) Water, Sewer and other service connection charge shall be paid as levied by
Authority.
Note: The
Authority or CEO shall be empowered to revise the fees/ charge mentioned in
clause No 7.
8.
Withdrawal of application�The applicant may withdraw
his application for a building permit at any time prior to the sanction and
such withdrawal shall terminate all proceedings with respect to such
applications but the fees paid shall in no case be refunded. The validity
period as specified in clause 12.
9. Scrutiny of the building permit -
i) The Authorized Officer shall verify or cause to be verified the facts given in
the application for permit, and enclosures. The title of the land shall also
be verified.
(ii) The Authorized Officer shall check the information listed in clause 6(1)A for
residential buildings on plots (other than Group Housing flatted).
(iii) For all other buildings, the Licensed Technical Person shall provide the
information in clause 6(1)B and provisions of fire safety requirements, public
convenience, safety provisions and other relevant laws as per Factories Act.
The Licensed Technical Person shall also be completely responsible for all
other provisions as per Building Regulations, Planning and Development
Directions, National Building Code, ISI standards and such other provisions as
required by the Authority from time to time.
(iv) The Owner and Licensed Technical Person shall jointly indemnify the Authority
against violation of Building Regulations, Planning and Development Directions
and provisions of National Building Code
(v) The Authority, however, reserves the right to perform test checks by complete
scrutiny of any of the plans submitted for approval.
(vi) In case of any violation, the Architect/Engineer/Town Planner shall be
blacklisted under intimation to Council of Architecture, Institutions of
Engineers or Institution of Town Planners, India respectively from practicing
in the Notified Area for a period of 5 years. In case of Draftsman, the
license issued by the Authority shall be cancelled.
(vii) In case the Owner is found responsible, the plot may be cancelled or any other
such action may be taken as decided by Chief Executive Officer depending upon
the merits of each case.
10. Sanction or refusal of building permit �
(i) After
filing of the application for building permit duly certified by the Licensed
Technical Person as per Appendix 4,. the applicant can commence the
construction. The Authorised Officer shall scrutinize the building permit and
may either sanction or refuse a building permit or may sanction it with such
modification and communicate the decision to the applicant in the prescribed
form given in Appendix-3.
(ii) If
within thirty days of the receipt of the application, refusal or sanction is
not granted, the application with its annexures shall be deemed to have been
allowed and the permit sanctioned provided such fact is immediately brought to
the notice of the Chief Executive Officer in writing by the applicant within
twenty days after the expiry of the period of thirty days but nothing herein
shall be construed to authorise any person to do anything in contravention of
these Regulations and Planning and Development Directions prepared under
Section 8 of the Uttar Pradesh Industrial Area Development Act, 1976.
(iii) In
case of the refusal, the Authorised Officer shall give reasons and quote the
relevant provisions of the regulations which the plan contravenes, as far as
possible in the first in�stance itself and ensure that no new objections are
raised when they are re-submitted after compliance of earlier objection.
(iv) Once
the plans have been scrutinised and objections, if any, have been pointed out,
the applicant shall modify the plans to comply with the objections raised and
re-submit them. lf the objec�tions remain unremoved for a period of one year,
the permit shall be refused.
11. Appeal against refusal or sanction with modifications of a
building permit�
Any applicant
ag�grieved by an order of refusal of a building permit or its sanction with
modifications may within thirty days from the date of communication of such
order, appeal to the Chief Executive Officer or Officer Authorised in this
behalf. The decision of the Chief Executive Officer on such appeal shall be
final, conclusive and binding.
12. Duration of validity of a building permit�
A layout/building
permit sanctioned under these regulations shall remain valid for the period
specified in the lease deed conditions and normally Completion Certificate has
to be submitted within this period. In special cases or category of cases
depending on the nature of formalities remaining unfulfilled, extend this
period for submission of completion certificate as he may deem fit. The nature
of such formalities and period for extension should be specified by a general
order or guideline issued by the Chief Executive officer. In case part
completion has been taken on the plot then validity of layout/building permit
shall be for 5 years.
Validity of
temporary structures shall be 5 years or period specified in the lease deed
conditions which ever is earlier. If the period expired in lease is less than
5 years then beyond this period any request for extension, if any, will be
granted only in extraordinary circumstances on a case to case basis by the CEO
subject to adequate justification & on payment of prescribed fees .In case
period specified in lease deed is more than 5 years then extension shall be
granted in multiple of 2 years after approval of the Chief Executive Officer.
After lapses of
validity period this applicant is liable to remove all such structures and
certificate shall not be granted without removal of such structures.
13. Additions or alterations during construction �
If any external
additions or alterations from the sanctioned plans are intended to be made,
permission of the Chief Executive Officer shall be obtained in writing before
the proposed additions/alterations are carried out. It shall be incumbent upon
the applicant to whom a build�ing permit has been sanctioned to submit amended
plans for such additions or alterations. The provisions relating to an
application for permit shall also apply to such amended plans with
modification that the time limit referred to in Regulation 10 (ii) shall be
thirty days.
14. Cancellation of permit for building activity�
If at any time
after the permit to proceed with any building activity has been sanctioned,
the Chief Executive Officer is satisfied that such permit was sanctioned� in
consequence of any material misrepresentation or fraudulent statement
contained in the applica�tion given or the information furnished, the Chief
Executive Officer may cancel such permit and any work done there under, shall
be deemed to have been done without permit. The Licensed Technical Person
found responsible for the same shall be blacklisted and debarred from
practising in area for 5 years. If the owner is found responsible, the plot
may be cancelled or any other such action may be taken as decided by Chief
Executive Officer depending upon the merits of each case.
15.
Work to be carried out in full accordance of Zoning
Regulations, Building Regulations and Directions�
Neither the
granting of the permit nor the approval of the drawings and specification, nor
inspection made by the Authority during erection of the building shall in any
way relieve the owner of such building from full responsibility for carrying
out the work in accordance with the requirements of Zoning Regulations of
Master Plan, these Regulations or Planning and Development Directions. In
case any violations are found during construction or after obtaining
completion the owner shall be required to rectify the same to the satisfaction
of the Authority within a period of 15 days from the time such violations are
intimated to the owner. In case the owner fails to comply, the Authority
shall ensure compliance and the expenditure incurred on doing so shall be
recovered from the owner before issue of completion certificate. In case
completion certificate has already been obtained, such expenditure shall be
recovered from the owner, if not paid within stipulated time, as arrears of
land revenue.
16. Documents at site �
The following
documents are to be kept at site during the construction of the building and
for such a period thereafter as required by the Authority:
(i) A copy of
building permit.
(ii) Copy of
approved drawings.
If the above
documents are found missing for two consecutive visits by Authorized Officer
from Authority a penalty of Rs. 1000 shall be levied for each such lapse. In
case building permit has not been granted and applicant has applied for
building permit then copy of receipt of documents shall be kept.
17. Notice of completion�
Every owner shall
have to submit a notice of completion of the building to the Authority
regarding completion of work described in the building permit as per
Appendix-9 accompanied by the documents as per checklist annexed with
Appendix 9 .
18.
Occupancy certificate necessary for occupation�
No building
erected, re-erected or altered, shall be occupied in whole or part until the
issue of occupancy certificate by the Chief Executive Officer in the form
given in Appendix-11. Provided that if the Chief Executive officer fails to
issue the occupancy certificate or send any intimation showing his inability
to issue such certificate within 40 days of the date of receipt of completion
certificate, the building may be occupied without waiting for such
certificate. Intimation to this effect shall have to be sent to the Authority
by the owner before occupying the same.
19.
Issue of occupancy certificate regarding Multi Storeyed
Building�
In the case of
buildings identified in clause 6 (B) (III) the work shall also be subjected to
the inspection of the Chief Fire Officer, U.P. Fire Service and the occupancy
certificate shall be issued by the Authority only after the clearance from the
Chief Fire Officer regarding the completion of work from the fire protection
point of view.
|